Six stations on a dial: jack (the legs reach the seabed and the hull rises 15 m), spud (the top drive turns the string), mud (down the pipe, chips back up), case (steel casing cemented to 900 m), BOP (the preventer under the floor) and pay (the oil sand from 2400 m).
Sea and rock are cut away to show the well inside; the vertical scale is compressed. The assumptions are in the note.
Model note
What the lab assumes and where its numbers come from.
Model: mud pressure at the bit P = rho g h = 1200 x 9.81 x (depth + 90 m of water + 25 m to the floor). Normal pore pressure 10.5 kPa/m (sea water). Water 90 m, air gap 15 m, casing to 900 m, pay sand from 2400 m, final depth 2600 m below the seabed. 120 rpm, 15 t on bit, 3000 L/min (typical assumptions). Vertical scale compressed; drilling shown as a time-lapse.
Sources
- 01Jack-ups generally work in less than 120 m of water. Wikipedia, Jackup rig.
- 02Typical air gap of 35 to 50 ft (10.7 to 15.2 m). PetroWiki, Jackups.
- 03Normal pore pressure gradient: 0.465 psi/ft (10.5 kPa/m). SEG Wiki, Pore pressure analysis.
- 04Range 2 drill pipe: 27 to 31 ft per joint. GlobalSpec, Drill pipe.